KSCdirect

Product Data

KSCdirect Part #: CH IZMX-AS22-40-1
Description: PXR AUXILIARY SWITCH WITH LONG LEADS KIT
MFG Part #: IZMX-AS22-40-1
UPC: 786685998510
Supplier: EATON
Usually ships in 1-2 days.
QTY:  
For shipping rates, add item to cart.
* Quantity discounts may be available. Call Kelly Supply at 800-918-8939.
Alternatively, you may e-mail info@kscdirect.com for service.

Details

Description

EATON Auxiliary Switch Kit, NRX/PXR Left Hand Pole, 250 V AC/125/250 V DC, 0.25/0.5/10 A, 2 Contacts, 2NO-NC, For Use With: RF Frame IZMX40 and INX40 Circuit Breaker, Plug-In, 8 x 2 x 2 in

Applications:

For ON/OFF signaling, electrical assemblies, panels and OEM's applications

Standards/Approval:

  • UL Listed

Attributes/Specifications

Amperage Rating 0.25/0.5/10 A
Connection Type Plug-In
Contact Configuration 2NO-NC
Dimensions 8 x 2 x 2 in
Number of Contacts 2
Suitable For Use With RF Frame IZMX40 and INX40 Circuit Breaker
Type NRX/PXR Left Hand Pole
Voltage Rating 250 V AC/125/250 V DC
Manufacturer EATON

Supplemental Files

This item has no supplemental files.