KSCdirect

Product Data

KSCdirect Part #: APE HC256N
Description: TAPE,LONG LEADER 3/8"X100'
MFG Part #: HC256N
UPC: 037103296856
Supplier: Crescent®
Usually ships 1-2 business days but timing may vary. Please chat with us if you have questions before ordering.
QTY:  
For shipping rates, add item to cart.
* Quantity discounts may be available. Call Kelly Supply at 800-918-8939.
Alternatively, you may e-mail info@kscdirect.com for service.

Details

Description

Crescent® Tape Measure, Series: Leader®, Measuring System: Imperial, 100 ft Blade Length, 3/8 in Blade Width, Steel Blade, Graduations: Graduated Feet and Inches to 1/8ths with Instantaneous Readings, 16 Inch Centers Indicated by a Diamond Symbol, Black on One Side Markings, Crank Rewind, Non-Locking Locking, Folding Hook Ring Hook, Vinyl Covered Steel Case, Black Case

Features:

  • Large easy action winding drum and friction washers
  • Nylon roller guides the tape smoothly in and out of case
  • Chrome Clad blade

Standards/Approval:

  • NIST Certified
  • RoHS Compliant

Warranty:

Limited Lifetime

Attributes/Specifications

Blade Length 100 ft
Blade Material Steel
Blade Width 3/8 in
Case Color Black
Case Material Vinyl Covered Steel
Graduations Graduated Feet and Inches to 1/8ths with Instantaneous Readings, 16 Inch Centers Indicated by a Diamond Symbol
Hook Type Folding Hook Ring
Locking Type Non-Locking
Markings Black on One Side
Measuring System Imperial
Rewind Type Crank
Series Leader®
Manufacturer Crescent®

Supplemental Files

This item has no supplemental files.